I
Come look and price it
We measure the room, check what the floor and walls are sitting on, and give you a written price. Free, and it holds.
II
Tear out
Old tile, tub, vanity, all of it gone. Floors and the path to the door get covered before anything moves.
III
Framing and prep
Anything out of plumb gets fixed, blocking goes in where the bench, niche and grab bars are going, and the floor gets levelled. Most bad tile jobs are actually lost right here.
IV
Waterproofing
Backer board, then a bonded membrane over the whole wet area. Inside corners, outside corners, the curb and the drain flange. We flood-test the pan before tile goes near it.
V
Snap the layout
We set the layout off the wall you see when you open the door, so full tiles land where your eye goes and the cuts end up in the corners.
VI
Set, grout, silicone
Tile set and cleaned as we go, grout the next day, silicone at every change of plane, then a final wash.
VII
Clean up and walk it
Garbage out, floors uncovered, and we walk the room with you before we leave.